Site Snapshot: Before the First Drill

Before drilling begins, every location and angle is carefully planned.

These photos show the GSI crew preparing the slope and beginning the drilling process according to the engineered layout and required inclination for each soil nail. Accuracy at this stage helps ensure the reinforcement system performs as intended once installation is complete.

Workers in blue shirts and hard hats operate equipment on a hillside, pulling cables with ropes while collaborating on a construction site.

It’s another example of the precision and workmanship behind every GSI slope protection project.

Need expert slope protection and geotechnical engineering solutions? Contact Ground Specialists, Inc. today.
📩 gsi@groundspecialists.com.ph
📞 (02) 8632-7088 / 0962-921-4127
📍 Unit 209 Cityland Pioneer, 128 Pioneer Street, Brgy. Buayang Bato, Mandaluyong City

Leave a Reply

Discover more from Ground Specialists, Inc.

Subscribe now to keep reading and get access to the full archive.

Continue reading